Cabinet replacement, countertops, layout changes, and full kitchen renovations built around how you actually cook.
A kitchen remodel has more moving parts than any other room: cabinets, counters, plumbing, electrical, ventilation, lighting, flooring, and appliance dimensions that all have to line up. Get the order wrong and you either lose weeks or lose money — sometimes both.
We plan the sequence before demo starts. Cabinet layout and appliance specs get locked in first, then rough-in, then surfaces. That discipline is why our kitchens finish on schedule instead of dragging into a fourth month.
We work with stock, semi-custom, and custom cabinetry depending on your budget, and we install quartz, granite, butcher block, and laminate countertops. For layout changes — moving a sink, opening a wall, adding an island — we handle the framing, minor plumbing and electrical, and coordinate any structural work that needs an engineer.
Design conversation: how you cook, what bothers you now, what you want to change.
Measure and layout plan, then material selection with real budget numbers.
Written estimate and a schedule with the sequence spelled out.
Demo, rough-in, cabinets, counters, tile, and finish over two to six weeks.
Final walkthrough, touch-ups, and appliance check.
Cabinet and counter replacement without layout changes typically runs $15,000 to $30,000. A full remodel with layout changes, new flooring, and lighting usually falls between $35,000 and $70,000. Custom cabinetry and high-end stone push it higher. We quote after a site visit.
Sometimes yes, if the boxes are solid and square. Refacing or new doors and drawer fronts is a real budget option and can look excellent. We will tell you honestly whether your cabinets are worth saving.
Two to six weeks for most residential kitchens, depending on whether walls move and how long countertop fabrication takes. We give you a sequence so you know which days the kitchen is unusable.
We can supply through our cabinet partners, or install cabinets you have purchased. Both are fine — we just need the specs early so the layout works.
Partially, in most cases. We try to keep the refrigerator and a temporary prep area available. Full demolition weeks are the exception.
Free, no-pressure estimate — usually back within one business day.